ITER site 2013

1st concrete pouring of the B2 Slab of the Tokamak complex - December 2013
 
1st concrete pouring of the B2 Slab of the Tokamak complex - December 2013
 
1st concrete pouring of the B2 Slab of the Tokamak complex - December 2013
 
1st concrete pouring of the B2 Slab of the Tokamak complex - December 2013
 
1st concrete pouring of the B2 Slab of the Tokamak complex - December 2013
 
1st concrete pouring of the B2 Slab of the Tokamak complex - December 2013
 
1st concrete pouring of the B2 Slab of the Tokamak complex - December 2013
 
ITER test convoy September 2013 © S Benacer/400ASA
 
ITER test convoy September 2013 © S Benacer/400ASA
 
ITER test convoy September 2013 © S Benacer/400ASA
 
ITER test convoy September 2013 © S Benacer/400ASA
 
Itinerary test convoy arrives successfully on site Copyright ITER IO
 
The Tokamak Pit and the Assembly Building Slab from the crane September 2013
 
The Tokamak Pit from the crane September 2013
 
ITER Worksite September 2013
 
Reinforcement works on going
 
Close to 4,000 tonnes of steel will be used for the B2 slab
 
New Cafeteria on the Contractors Area 2
 
The new Worksite Restaurant opened on 9 September 2013
 
The new Worksite Restaurant opened on 9 September 2013
 
Close to 3000 workers are expected to be installed on the CA2
 
The New Infirmary is open on the Contractors Area 2
 
1,600 embedded plates are expected to be installed for the whole slab
 
Embedded plates : Interface between the civil works and the process supporting system
 
Galleries works around the Tokamak on going
 
Galleries works around the Tokamak on going
 
ITER_Critical_Network_September 2013
 
ITER Aerial view - September 2013
 
ITER Aerial view - September 2013
 
Contractors Area 2_New cafeteria ready  - June 2013
 
Contractors Area 2_Brand new canteen_opening in September - June 2013
 
Assembly Building basemat completed_space left for tooling - June 2013
 
Galleries_Formwork & reinforcement works walls on going
 
Tokamak Pit - The round shape of the future Tokamak is now apparent - June 2013
 
Tokamak Pit - Curved steel rebars installation for the B2 slab - June 2013
 
Tokamak Pit -Thickness of the B2 slab : 1.5 meters  - June 2013
 
Tokamak Pit - Reinforcement works on going - June 2013
 
Tokamak Pit_ Location of the future staff elevator
 
ITER site - Aerial View - June 2013 © M. Postollec, O. Gillain - Engage
 
ITER site - Aerial View - June 2013 © M. Postollec, O. Gillain - Engage
 
Galleries of the Tokamak complex - Reinforcement activities - May 2013
 
Tokamak area - Propping & formwork almost completed - May 2013
 
Tokamak Pit_Reinforcement activities on going for the B2 slab - May 2013
 
Tokamak Pit_Reinforcement activities on going for the B2 slab - May 2013
 
Tokamak Pit_Reinforcement activities on going for the B2 slab - May 2013
 
Tokamak Pit_Reinforcement activities on going for the B2 slab - May 2013
 
Iter platform - May 2013
 
80% of the propping & shoring towers installed _ May 2013
 
Galleries of the Tokamak complex - Reinforcement activities - May 2013
 
Critical Network_General backfilling of the trench, May 2013
 
Critical Network_General backfilling of the trench, May 2013
 
Canteen ready to receive its equipment, May 2013
 
Contractors Area 2_Backfilling of the car park on going
 
Reinforcement works of the galleries around the Tokamak (TB alpha)
 
Shoring towers & formwork installation for the B2 slab.
 
Shoring towers & formwork installation for the B2 slab.
 
Galleries works around the Tokamak on going
 
This area will be soon ready to welcome the contractors
 
Backfilling of the pipes on going
 
Pipes laying & backfilling on going
 
Assembly hall slab completed this month
 
1600 embedded plates will be installed for the completion of the B2 slab
 
A 150 m2 mock-up was created to facilitate the works of the Tokamak upper concrete slab
 
Half of the formwork & shoring towers installed
 
Half of the formwork & shoring towers installed - April 2013
 
Formwork & shoring towers being installed above the 493 anti-seismic bearings
 
Formwork & shoring towers being installed above the 493 anti-seismic bearings
 
Reinforcement activities have started in the Tokamak Pit
 
The new upper base slab will be supported by the 493 anti-seismic bearings and plinths
 
The new upper base slab will be supported by the 493 anti-seismic bearings and plinths
 
Contractors Area 2_Equipment on going in the new canteen – March 2013
 
Overflow network_ Pipe’s backfilling activities – March 2013
 
Overflow network_ Pipe’s backfilling activities – March 2013
 
Contractors Area 2_New canteen opening in June_ 1500 meals per day – March 2013
 
ITER Tokamak complex ready to welcome the second concrete slab – March 2013
 
Propping & Formwork Activities started for the second concrete basemat in the Tokamak Pit – March 2013
 
Tokamak Pit_ Implementation of the cantilevered work platform for galleries – March 2013
 
Assembly Hall of the Tokamak Complex _ Basemat close to be ready – March 2013
 
Assembly Hall Area_ Reinforcement Activities 85% done_ Plots Concrete Pouring almost finished - March2013
 
Formwork activities have started at the Tokamak pit for the realisation of the second concrete slab - March 2013
 
ITER site - Aerial View - March 2013 © MatthieuCOLIN.com / ITER Organization
 
ITER site - Aerial View - March 2013 © MatthieuCOLIN.com / ITER Organization
 
Critical network - Precipitation drainage system - Manholes - PR1 area
 
Overflow network - pipes’ backfilling
 
Overflow network - pipes’ backfilling
 
Overflow network - pipes’ backfilling
 
Overflow network - pipes’ backfilling
 
Critical network_Precipitation drainage system_overflow section
 
Health and safety exercise. Evacuation of the wounded by the emergency services
 
Health and safety exercise. Evacuation of the wounded by the emergency services
 
Health and safety exercise. CEA Safety team in action
 
Health and safety exercise. Prompt action from emergency responders
 
The Assembly Hall of the Tokamak Complex Area. Approximately 1400 tonnes of steel will be used for the reinforcement activities
 
Precipitation Drainage System. The deepest network of the platform in progress with pipes laying and backfilling on going.
 
The new canteen erected at the Contractors Area n°2. Works in the area of internal  networks and equipment on going. Delivery: June 2013
 
Overview of the Assembly Hall of the Tokamak Complex Area. Concrete pouring planned until March 2013

Back

Copyright disclaimer:
  1. Please credit F4E as the source of the image. Examples : Photo: F4E; Image: F4E.
  2. The image must not be used to state or imply the endorsement by F4E or any F4E employee of a commercial product, process or service, or used in any other manner that might mislead.
  3. If the image is to be used in advertising or any commercial promotion, layout and copy must be submitted to F4E beforehand for approval.

Twitter
RSS Signup
Signup to our news
You Tube
You Tube